Mobilization Checklist | If Needed |
- Set up and test run Minivane
- Clean and lube all minivane extensions/ blades
- Set up, test, WD 40 on Torvane (geotech cruise only-- NO WD-40 for geochem!!)
- Set up the liner racks in lab with bungee cords to hold cores
- Set up liner troughs and secure to deck - put high-vis tape on the legs. They are a trip hazard - especially in the dark.
- Set up black crates on deck with rods and caps, secure to deck
- Clean, lube and store all equipment:
- Unwrap and rat tail black and white tape
- Cut wax paper into quarters
- Check, clean and lube liner cutters - make sure blade is new
- Set up coolers with inventory sheets
- Set up spreadsheet and customize to job- double check spring set calibrations
- Check camera (test it) and memory cards, reader, plenty of batteries
- Make sure entire lab can be secured for rough seas and plan ahead - eye hooks in wall, bungees, ropes, etc.
|
- Set up Crock pot - test and bungee to cabinet
- Set up geochem station:
- Make sure Nitrogen is flowing and valve works
- Mount extruder to the bench
- Attach the can holders to the bench
- Mix up poison (BKC?)
- If possible, lube first section of trough - so it will swivel after cutting liner
- Set up Minivane basket or PC caddy
- Make enough push tubes for the project and bevel the ends
- Locate and inventory the 3 inch liner cutter repair kit. Make sure you have enough blades, cutters and spare parts to finish the job.
---------Calculations-----------
- One roll tape per JPC section – full 64 ft core will have 21- 22 sections
- Piston cores will have 6 sections if full – plan on 2 rolls white and 2 rolls black per core
- Meter box core – estimate 39 inches to bot of box and another poss. 6 inches for scoop. ( do NOT mv into scoop) Readings are every four inches – need two sets of mv extensions and cones
- Regular box core is 20 inches deep- readings every 2 inches
|